Skip to main content

Israel's complex infrastructure project

The last two tenders for Israel’s Road 531 project are now being published by the Israel National Roads Company. The tenders will form part of one of the largest single infrastructure projects ever planned in Israel. These two are for a complex series of works including a three storey interchange, underground crossings for railways and roads and relocation of the coastal line for Israel Railways. Also included in the works are the construction of two large water pumping stations and a series of paths for pe
April 25, 2012 Read time: 2 mins
The last two tenders for Israel’s Road 531 project are now being published by the 2602 Israel National Roads Company.

The tenders will form part of one of the largest single infrastructure projects ever planned in Israel. These two are for a complex series of works including a three storey interchange, underground crossings for railways and roads and relocation of the coastal line for Israel Railways. Also included in the works are the construction of two large water pumping stations and a series of paths for pedestrians and cyclists. Road 531 is a central east-west link and connects the Northern part of Tel Aviv with Israel's north-south roads. The aim of the project is to tackle congestion and construction of three sections of the road has already begun. The vast project is for work to both roads and railways, with 11 interchanges and 36 bridges and tunnels in all. The road will feature four to six lanes in each direction, with a total cost of some US$985 million (3.7 billion NIS). Construction will take four years and is for a multi-lane suburban highway with railway tracks and passenger stations running alongside. Work on the road network is being integrated with the construction of the rail connections. The project is complex as the ground conditions and topography provide engineering challenges. Further complexities are added by the need to build the road and rail links in cuttings, requiring the construction of a network of protective retaining walls. These will prevent the ingress of water into the road area and the work requires the construction of two of massive water pumping stations. One of the major features will be the innovative, three level interchange design that will include both road and railway connections. This will also include several underground crossings.

Related Content

  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Holding back
    February 6, 2012
    AN INNOVATIVE slurry wall solution has been used by Bachy Soletanche at the Alderley Edge By-Pass project in the UK. Bachy Soletanche provided assistance for the A34 Alderley Edge by-pass project in the UK being carried out by main contractor Birse Civils. This solution was required to tackle challenges posed by the water table at the Welsh Row section. Bachy Soletanche used its experience with slurry cut-off walls, a technique rarely used in Britain on road construction, to benefit a tricky section of the
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports