Skip to main content

Israel's complex infrastructure project

The last two tenders for Israel’s Road 531 project are now being published by the Israel National Roads Company. The tenders will form part of one of the largest single infrastructure projects ever planned in Israel. These two are for a complex series of works including a three storey interchange, underground crossings for railways and roads and relocation of the coastal line for Israel Railways. Also included in the works are the construction of two large water pumping stations and a series of paths for pe
April 25, 2012 Read time: 2 mins
The last two tenders for Israel’s Road 531 project are now being published by the 2602 Israel National Roads Company.

The tenders will form part of one of the largest single infrastructure projects ever planned in Israel. These two are for a complex series of works including a three storey interchange, underground crossings for railways and roads and relocation of the coastal line for Israel Railways. Also included in the works are the construction of two large water pumping stations and a series of paths for pedestrians and cyclists. Road 531 is a central east-west link and connects the Northern part of Tel Aviv with Israel's north-south roads. The aim of the project is to tackle congestion and construction of three sections of the road has already begun. The vast project is for work to both roads and railways, with 11 interchanges and 36 bridges and tunnels in all. The road will feature four to six lanes in each direction, with a total cost of some US$985 million (3.7 billion NIS). Construction will take four years and is for a multi-lane suburban highway with railway tracks and passenger stations running alongside. Work on the road network is being integrated with the construction of the rail connections. The project is complex as the ground conditions and topography provide engineering challenges. Further complexities are added by the need to build the road and rail links in cuttings, requiring the construction of a network of protective retaining walls. These will prevent the ingress of water into the road area and the work requires the construction of two of massive water pumping stations. One of the major features will be the innovative, three level interchange design that will include both road and railway connections. This will also include several underground crossings.

Related Content

  • Jam busting project awarded in Israel
    February 28, 2012
    The tender process for the project to builds the Dror interchange at Lev Hasharon in Israel has been won by Ramat.
  • Israeli road deal
    March 22, 2012
    The tender has now been published by the Israel National Roads Company for the upgrade to Road No 85, a project expected to cost US$134.2 million (500 million NIS). The work includes widening and building an interchange on Roads No 85, which along with improvements to Road No 65 forms a key component of the Netivei Israel plan.
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Israel's latest road tender
    February 28, 2012
    The first of a series of new road tenders has been announced in Israel with a deal for the widening of Road 75.