Skip to main content

Israel project -tenders opening

Tenders are being called for the new Road 9 construction project in Israel.
February 29, 2012 Read time: 1 min
Tenders are being called for the new Road 9 construction project in Israel. The 10km road will connect Hadera and surrounding towns with Road 6 in the Sharon region. The project is planned on the design build approach and has an estimated of US$199 million. When the road is complete it will help improve traffic flow in the Sharon region and the link is due for completion in three years. The highway will feature two lanes in each direction, with a planned speed limit of 110km/h. As part of the project, a new interchange will be built, the Hadera South interchange. This will connect Hadera and Emek towns to the new road, providing access to Roads 4 and 6. Five new bridges will be built along the road, as well as crossing for agricultural purposes.

Related Content

  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b