Skip to main content

Israel project -tenders opening

Tenders are being called for the new Road 9 construction project in Israel.
February 29, 2012 Read time: 1 min
Tenders are being called for the new Road 9 construction project in Israel. The 10km road will connect Hadera and surrounding towns with Road 6 in the Sharon region. The project is planned on the design build approach and has an estimated of US$199 million. When the road is complete it will help improve traffic flow in the Sharon region and the link is due for completion in three years. The highway will feature two lanes in each direction, with a planned speed limit of 110km/h. As part of the project, a new interchange will be built, the Hadera South interchange. This will connect Hadera and Emek towns to the new road, providing access to Roads 4 and 6. Five new bridges will be built along the road, as well as crossing for agricultural purposes.

Related Content

  • Linking Kenya and Uganda with a new road project
    May 10, 2018
    An upgraded road link will improve transport between Uganda and Kenya - Shem Oirere reports Rainfall patterns and type of soil in an agricultural rich area shared by the neighbouring East African countries of Kenya and Uganda was a key consideration in arriving at the decision to upgrade to bitumen standards 73km of the 118km Kapchorwa-Kitale road that links the two countries. Initially, Uganda had proposed to have the road between Kapchorwa and Suam on its border with Kenya re-gravelled and widened to a
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.
  • Texas contract awarded to joint venture
    March 31, 2022
    A major Texas road contract has been awarded to a joint venture team.
  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports