Skip to main content

Israel interchange

A new US$350 million road project by the Israel National Roads Company will boost connectivity from the north to the centre of the country. The project is seeing the opening of new interchanges and roads in western Galilee. The aim of the project was to double the traffic capacity on Road 77, the Hamovil and Somech junctions and road No 79 that connects them.
May 2, 2012 Read time: 3 mins
A new road project in Israel will boost connectivity
A new US$350 million road project by the 2602 Israel National Roads Company will boost connectivity from the north to the centre of the country. The project is seeing the opening of new interchanges and roads in western Galilee. The aim of the project was to double the traffic capacity on Road 77, the Hamovil and Somech junctions and road No 79 that connects them. This will improve safety and increase capacity on the road to Nazareth, the Sea of Galilee and back. The work increases the speed limit to 100km/h and reduce journey times, while delivering safe and high-quality roads for users. The work has been needed as Road No 79 is a central east-west artery connecting the Nazareth metropolis with the metropolis of Haifa.

The project included construction of interchanges at the Hamovil and Somech junctions, which are among the most important of their kind in northern Israel. This project forms an integral part of the Netivei Israel plan, programme designed to boost the transportation network between the country's centre, the Negev (the south) and Galilee (the north).

The work involved widening the roads by adding a lane in each direction, construction of a 120m long bridge at Hamovil interchange, construction of a three level interchange at Somech and the installation of a concrete safety barrier between lanes. The work also encompassed expanding the road shoulders, upgrading Ishai junction, landscaping works, improving junctions and construction of five mini-interchanges, the addition of bus stations and building paths for pedestrians.

The new interchanges serve residents of the Jezreel valley, Sea of Galilee, Nazareth and its surroundings. Road No 77 to Hamovil interchange and Road No 79 from Hamovil interchange to Somech interchange have been expanded into two-lane roads, and the permitted driving speed was increased to 100km/h.

At Somech interchange, the junction of roads No 70 and No 79 has been transformed into a rapid interchange, with a tunnel for drivers from the Galilee to Haifa on the lower level, and at its center open space of a light railway. The revsied Somech interchange also eliminates most of the traffic lights at the junction.

Construction of the interchange was designed to bring forward the connection to the Cross-Israel Highway (Highway 6) when it will be continued to the north, toward the western Galilee. In its center, space was allocated for the future construction of a light railway line between the Krayot (Haifa suburbs) and Nazareth.

The interchange work was carried out over the past two and a half years and included building a 100m long bridge and upgrading the major roads entering and exiting the interchange. Work was conducted with minimal interference to the heavy traffic in the area.

Related Content

  • Improvements being made to key Israeli highway
    June 19, 2013
    The Israeli Government is working on plans to ease traffic flow between Tel Aviv and Jerusalem. Improvements are being made to two roads, Highway 443 and Highway 1. The upgrade works for Highway 1 will cost in the region of US$695 million and will be carried out by Israel National Roads/Netivei Israel. The work will see the construction of two new bridges measuring 800m long apiece and featuring three lanes each as well as two 700m tunnels under the Harel Bridge. Also included are new interchanges in Harel,
  • Kenya moves ahead with double-decker road to address costly city traffic jams
    December 11, 2013
    New double deck roads could cut congestion in Kenyan capital Nairobi – Shem Oirere reports Arapid increase in urban population and diminishing land for infrastructure expansion has forced Kenya to devise ways of addressing the worsening human and vehicular traffic problems in its capital Nairobi. The country national highways agency recently announced progress in the planned construction of the country’s first double-decker highway.
  • Concrete pumps speed busy road upgrade
    February 14, 2012
    WORK ON a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city. The junction, when viewed from above, looks like a flatly pressed four-leaf clover, and can no longer cope with traffic volumes. Two national motorways, the A 9 and the A 92, intersect at the
  • Concrete pumps speed busy road upgrade
    May 3, 2012
    Work on a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city.