Skip to main content

Iran's new bridge

Construction activity has now commenced on Iran's new Persian Gulf Bridge project.
March 2, 2012 Read time: 1 min
Construction activity has now commenced on Iran's new Persian Gulf Bridge project. The US$909.5 million project is for a 2.2km long bridge that will connect Iran's mainland to Qeshm Island in the Persian Gulf. Iran's Government is funding 15% of the project with the remaining 85% coming from local and foreign investors.

Related Content

  • $1.49 billion for Oregon-Washington bridge
    August 26, 2024
    The existing Interstate 5 bridge connecting Portland and Vancouver over the Columbia River in the US northwest is actually two parallel bridges – one dating back to 1917.
  • Nepal-India bridge project planned
    September 4, 2017
    Plans are being drawn up for a new bridge connection that will link Nepal with India. The bridge will span the Mechi River and will connect India’s Panitanki Bypass with Nepal’s East-West Highway. The project has been the subject of discussions between the two countries and is now moving forward following the successful conclusions of talks. The aim of the project is to boost trade and transport between the two nations. Construction of the 1.5km bridge link is expected to cost US$24.8 million
  • Malaysia tunnel project moving ahead?
    July 11, 2018
    Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel. There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the
  • Prequalification tender for Oman carriageway project floated
    June 13, 2013
    The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length