Skip to main content

Iran's new bridge

Construction activity has now commenced on Iran's new Persian Gulf Bridge project.
March 2, 2012 Read time: 1 min
Construction activity has now commenced on Iran's new Persian Gulf Bridge project. The US$909.5 million project is for a 2.2km long bridge that will connect Iran's mainland to Qeshm Island in the Persian Gulf. Iran's Government is funding 15% of the project with the remaining 85% coming from local and foreign investors.

Related Content

  • Tenders soon to replace Beaumont Bridge
    May 4, 2021
    The Waka Kotahi, NZ Transport Agency, said construction over the Clutha River is expected to take two years and cost around US$14.5 million.
  • LA1 bridge project faces construction delay
    February 9, 2023
    The Department of Transportation and Development in the US state of Louisiana said delay to the US$57.7 million project could be as much as 10 months.
  • Providence Viaduct project underway
    September 4, 2020
    Work is now underway on the Providence Viaduct project.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.