Skip to main content

Iran's new bridge

Construction activity has now commenced on Iran's new Persian Gulf Bridge project.
March 2, 2012 Read time: 1 min
Construction activity has now commenced on Iran's new Persian Gulf Bridge project. The US$909.5 million project is for a 2.2km long bridge that will connect Iran's mainland to Qeshm Island in the Persian Gulf. Iran's Government is funding 15% of the project with the remaining 85% coming from local and foreign investors.

Related Content

  • Bridge construction changes increase costs
    May 9, 2012
    The cost of the Strait of Messina bridge looks set to climb from original estimates.
  • Chile’s major bridge project to go ahead
    June 19, 2017
    Construction work could commence on Chile’s landmark Chacao Bridge project as early as July 2017. The construction work is being carried out by a consortium called CPC. The new suspension bridge will be 2.6km long and will connect Chiloe Island with the mainland, costing some US$800 million to build. The design allows the structure to cope with massive earthquakes, due to the risk in this region of Chile.
  • Armenia north-south highway route
    October 9, 2017
    Plans are being drawn up in Armenia for the new North-South Highway project. Measuring some 556km in all, the project is expected to cost in excess of US$2 billion to construct, although there it is possible that the final pricetag will be somewhat higher. The country's Ministry of Transport says that the southern section of the highway between Artashat and Megri will cost $1.5 billion to build alone.
  • Costs climb for Messina bridge in Italy
    February 24, 2012
    The cost of the Strait of Messina bridge looks set to climb from original estimates.