Skip to main content

Interchange project to cut congestion

The construction of a new interchange to the south east of Casablanca in Morocco will make a substantial reduction in traffic congestion when it is complete. Work started on the interchange in February of this year, once of several major road projects being carried out in the area around the city. The work is expected to take 32 months to complete. The new interchange is much needed as Morocco’s traffic volumes have increased substantially in recent years due to a higher percentage of citizens owning privat
July 13, 2016 Read time: 2 mins
Once the new interchange to the south east of Casablanca is complete, congestion will be reduced at peak periods
The construction of a new interchange to the south east of Casablanca in Morocco will make a substantial reduction in traffic congestion when it is complete. Work started on the interchange in February of this year, once of several major road projects being carried out in the area around the city. The work is expected to take 32 months to complete. The new interchange is much needed as Morocco’s traffic volumes have increased substantially in recent years due to a higher percentage of citizens owning private vehicles, while Casablanca’s population has also grown significantly. Traffic congestion can be severe at peak periods. The interchange project is costing close to US$67 million due to its scale and complexity. The construction work includes building 2km of underpasses and 10 bridges over a 3km stretch. The interchange will improve the traffic connections between the commercially important Casablanca Finance City (CFC) area and the international airport lying just to the south of the city.

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • New Thames River bridge crossing proposed for UK capital London
    July 2, 2014
    Plans are once more being put forward for a new bridge spanning the River Thames in East London. The proposed structure is expected to cost in the region of €750 million (£600 million) to build and has been designed by Arup and HOK. The campaign for the new bridge is being led by the London Chamber of Commerce and Industry (LCCI), which says that there is a desperate need for an additional crossing. The campaign group also has the support of City Airport, which lies on the north side of the Thames and would
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Morocco’s big bridge for Rabat bypass
    January 9, 2015
    Construction work is on track with the new cable-stayed bridge close to Morocco’s coastal city of Rabat. The cable-stayed bridge will form part of Rabat’s new bypass and will be the largest such structure in Africa when it is complete, later this year. The bypass crosses the Bouregreg valley and measures some 41km. The bridge itself will measure 950m and span 376m, with three lanes in each direction. Construction of the bridge has been financed by the World Bank and Autoroutes du Maroc (ADM) and is costing