Skip to main content

Inter-Oceanic Corridor, Guatemala construction from April 2014

The construction of the Inter-Oceanic Corridor in Guatemala is expected to get underway in April 2014, following the completion and approval of feasibility studies. The project will require between US$ 10 billion and $12billion in investments and unite the Pacific with the Caribbean through the construction of a 372km motorway, two railway lines (for freight and passengers) and five pipelines. A total of two ports will also be constructed, one in the Pacific and one in the Atlantic. Construction works will
August 9, 2013 Read time: 2 mins
The construction of the Inter-Oceanic Corridor in Guatemala is expected to get underway in April 2014, following the completion and approval of feasibility studies

The project will require between US$ 10 billion and $12billion in investments and unite the Pacific with the Caribbean through the construction of a 372km motorway, two railway lines (for freight and passengers) and five pipelines. A total of two ports will also be constructed, one in the Pacific and one in the Atlantic. Construction works will take at least five years.

The Inter-Oceanic Corridor is a private sector project supported by the Guatemalan government. Executive President of the project, Guillermo Catalan, has said that 3,533 plots of land will be purchased over coming months in order to make way for the project.

According to Catalan, construction of the Corridor will invigorate the country's economy and generate more than 30,000 direct jobs. It will also benefit 46 of the country's 333 municipalities directly.

Related Content

  • Inter-oceanic Corridor for Brazil-Bolivia-Chile
    March 2, 2015
    A new Bolivian link is playing a key role in a major Latin American highway – Mauro Nogarin reports. Construction of a new route through Bolivia will help deliver improved transport between Latin America’s Pacific and Atlantic coasts. The construction of the highway between Santa Barbara-Caranavi-Quiquibey has been carried out by the consortium ARBOL. This firm is a partnership between the Argentinean company Grupo Eling and Administradora de Caminos Boliviana (ABC). The stretch of highway is an important s
  • Inter-oceanic Corridor for Brazil-Bolivia-Chile
    March 2, 2015
    A new Bolivian link is playing a key role in a major Latin American highway – Mauro Nogarin reports. Construction of a new route through Bolivia will help deliver improved transport between Latin America’s Pacific and Atlantic coasts. The construction of the highway between Santa Barbara-Caranavi-Quiquibey has been carried out by the consortium ARBOL. This firm is a partnership between the Argentinean company Grupo Eling and Administradora de Caminos Boliviana (ABC). The stretch of highway is an important s
  • Indonesia cancels Sunda Strait Bridge connecting Java and Sumatra
    November 11, 2014
    Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project. The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity. But the Jakarta Post newspaper reported that recently elected President Joko Widodo had
  • Brazilian road spend dips slightly for 2015
    July 9, 2015
    Brazil will spend at least US$1.63 billion in privately operated federal road infrastructure projects in 2015. This is down slightly, from $1.82 billion spent in 2014, according to estimates by the land transport agency NTT. Work this year includes a stretch of the BR-050 motorway operated by MGO, which already has seen around $104 million. Road operator Concer, which administers sections of the BR-060, BR-153 and BR-262, invested nearly $88 million between 2014 and the first quarter of 2015. Arter