Skip to main content

Innovative bridge planned for Brunei

A feasibility study is now in hand for a 10km bridge in Brunei to link Temburong with Brunei-Muara. Ove Arup & Partners has been awarded the contract for the bridge study, a deal worth some US$2.1 million that is expected to take 18 months to complete.
May 28, 2012 Read time: 1 min
A feasibility study is now in hand for a 10km bridge in Brunei to link Temburong with Brunei-Muara. Ove 1419 Arup & Partners has been awarded the contract for the bridge study, a deal worth some US$2.1 million that is expected to take 18 months to complete. When complete the 10km bridge will form part of the 30km road between Temburong and Brunei-Muara. A cost estimate for the 10km bridge and the entire 30km road connection has yet to be revealed however.

For more information on companies in this article

Related Content

  • Port road expansion programme in Esperance, Western Australia
    April 4, 2012
    Port road improvements worth US$104 million (A$100 million) will boost connectivity for a key facility in Western Australia. A contract for Esperance's port has been awarded by Australia's Main Roads West Australia to Australia-based John Holland. The engineering and construction firm will be responsible for diversion of a 1.3km section of railway, realignment of 1.8km road and construction of two bridges to cross the railways. The firm, which is a unit of Leighton Holdings, is expected to take around 18 mo
  • New Danube River bridges proposed
    September 6, 2024
    Two new Danube River bridge crossings are being proposed.
  • Chile bridge design unveiled
    June 27, 2016
    The final design of Chile’s Chacao Bridge has now been revealed. This project is expected to cost in the order of US$700 million. The initial design was unveiled in 2015 but was then subject to a number of modifications to better meet requirements. South Korean company Hyundai is playing a central role in the consortium that will build the project although its partners for the work have yet to be finalised. Plans to build a bridge connecting Chiloe Island to the Chilean mainland have been discussed for some
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.