Skip to main content

Innovative bridge design in the US wins key industy award

The HDR-designed Marc Basnight Bridge in North Carolina recently won the Deep Foundation Institute’s Outstanding Project Award.
June 24, 2019 Read time: 2 mins
HDR-Basnight: Key industry award for North Carolina’s new bridge link

The 2418 HDR-designed Marc Basnight Bridge in North Carolina recently won the Deep Foundation Institute’s Outstanding Project Award. This recognises the innovative foundation design of the US$252 million bridge and will be given at DFI’s awards banquet on October 17th in Chicago.

The new 4.5km bridge provides a 100-year service life, resists unprecedented scour depths and minimizes environmental impacts while offering a reliable, safe passageway for residents, visitors and tourists. As the lead design firm, HDR provided all roadway, geotechnical and bridge design as well as environmental permitting services for the new bridge.

The structure provides a critical link across the Oregon Inlet — widely acknowledged as the most dangerous channel on the Atlantic Coast. Its predecessor, the Herbert C Bonner Bridge, suffered from severe scour and deterioration in the harsh marine environment, resulting in regular maintenance, repair and retrofitting by the 4027 North Carolina Department of Transportation.

“For many years, the potential scour design challenges have been known,” said geotechnical engineer Brian Keaney. “However, through a lot of hard work and our understanding of the subsurface conditions, our geotechnical team pioneered innovative pile verification methods that NCDOT and the design-builder accepted to solve this unique problem.”

An innovative bridge foundation design that used a combination of jetting and driving to install precast, prestressed concrete piles was key to project success. The foundations were designed to resist scour depths as great as 25.6m. Installing piles to the needed depths meant developing a first-of-its-kind method for calculating scour loss.

“Throughout this project, I’ve told people that the replacement of the Bonner Bridge isn’t a bridge job; it’s a complex marine foundation job with a bridge stuck on top,” said Domenic Coletti, design manager for the project. “The foundations were the key to the entire project.”

To maximise efficiency, the bridge was divided into five “regions,” with the design of each region’s foundations tailored to fit its distinctive subsurface and scour conditions, span length and height requirements, and load demands. In total, there are 690 piles measuring more than 24km in length combined.

The new bridge opened to traffic on February 25th, 2019, and provides a modern link between Bodie and Hatteras Islands.

For more information on companies in this article

Related Content

  • Six bauma Innovation Award 2013 winners revealed
    January 6, 2017
    The six bauma Innovation Award 2013 winners have been revealed. Pipe Express, from Herrenknecht, triumphed in the Machinery category, while AutoPilot Field Rover, from Wirtgen, took the Machine Components section. The Construction process/Construction work category had two winners.
  • Six bauma Innovation Award 2013 winners revealed
    April 15, 2013
    The six bauma Innovation Award 2013 winners have been revealed. Pipe Express, from Herrenknecht, triumphed in the Machinery category, while AutoPilot Field Rover, from Wirtgen, took the Machine Components section. The Construction process/Construction work category had two winners.
  • 1st IRF Europe & Central Asia Regional Congress held on in Turkey
    November 18, 2015
    The International Road Federation (IRF) organised its first Regional Congress & Exhibition in Istanbul, Turkey on 15–18 September, 2015 The IRF is a non-governmental, not-for-profit membership organisation founded in Washington, DC in 1948 with the mission to encourage and promote development and maintenance of better, safer and more sustainable roads and road networks around the world.
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during