Skip to main content

Innovative bridge in Abu Dhabi

The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic.
February 23, 2012 Read time: 1 min
The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic. The US$266.6 million bridge measures 845m long and features eight traffic lanes, with four in either direction and was designed by architect 4122 Zaha Hadid. This new structure connects Abu Dhabi to the mainland and will help cope with the rapidly increasing traffic volumes in the area. The structure features an innovative design combining concrete pre-stressed boxes, steel arches and a cable stayed section, with much of the engineering work having been carried out by consultant 3096 High Point Rendel.

For more information on companies in this article

Related Content

  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • US$1.17 billion bridge for Thailand island
    August 1, 2024
    A US$1.17 billion bridge is planned to a Thai island.