Skip to main content

Innovative bridge in Abu Dhabi

The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic.
February 23, 2012 Read time: 1 min
The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic. The US$266.6 million bridge measures 845m long and features eight traffic lanes, with four in either direction and was designed by architect 4122 Zaha Hadid. This new structure connects Abu Dhabi to the mainland and will help cope with the rapidly increasing traffic volumes in the area. The structure features an innovative design combining concrete pre-stressed boxes, steel arches and a cable stayed section, with much of the engineering work having been carried out by consultant 3096 High Point Rendel.

For more information on companies in this article

Related Content

  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • $6.2 billion Newark Bay Bridge replacement
    July 9, 2025
    The $6.2 billion Newark Bay Bridge replacement project is moving ahead.
  • Concession tender for Brazilian bridge
    December 8, 2014
    Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl