Skip to main content

Innovative bridge in Abu Dhabi

The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic.
February 23, 2012 Read time: 1 min
The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic. The US$266.6 million bridge measures 845m long and features eight traffic lanes, with four in either direction and was designed by architect 4122 Zaha Hadid. This new structure connects Abu Dhabi to the mainland and will help cope with the rapidly increasing traffic volumes in the area. The structure features an innovative design combining concrete pre-stressed boxes, steel arches and a cable stayed section, with much of the engineering work having been carried out by consultant 3096 High Point Rendel.

For more information on companies in this article

Related Content

  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • $6.2 billion New Jersey Turnpike project
    May 16, 2025
    Approval is given for the $6.2 billion New Jersey Turnpike project.
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.