Skip to main content

Infrastructure condition warnings possible from research project

Advanced research could provide warnings as to damage to infrastructure. The research project has been carried out jointly by the National Physical Laboratory and University of Strathclyde. This uses mathematical techniques to provide early warning signals of structural damage in civil megastructures. The technique uses tipping point analysis to review data from structural health sensors on civil constructions, identifying early warning signs of upcoming damage. According to the research partners, this is f
November 18, 2016 Read time: 2 mins
Advanced research could provide warnings as to damage to infrastructure. The research project has been carried out jointly by the National Physical Laboratory and University of Strathclyde. This uses mathematical techniques to provide early warning signals of structural damage in civil megastructures. The technique uses tipping point analysis to review data from structural health sensors on civil constructions, identifying early warning signs of upcoming damage. According to the research partners, this is far more effective than the current method of on-site checks by eye. This technique could shift structural health monitoring to being preventative rather than reactive, and could be of great benefit to the construction industry. A good example of where early warning techniques could have helped is with the 20 day Forth Road Bridge closure in 2015. Instead of causing long periods of delays, the issue could have been spotted far earlier and dealt with before it required such extreme action.

The method is reported in a paper; ‘Tipping point analysis of cracking in reinforced concrete’. And the system is is about to be tested on steel beams, taking the mathematical theory and applying it to real life. The aim from this is to develop hardware and software products that, together with existing sensors, will provide a rapid and automated means of monitoring the health of civil and construction projects throughout their lifetime.

Related Content

  • Recycling advances from Wirtgen
    June 18, 2012
    German firm Wirtgen is retaining its lead in road recycling technologies – Mike Woof writes Tests on cold recycling with a new layer thickness using Wirtgen's sophisticated WR 4200 machine have shown impressive results according to the firm. The road construction and traffic authority Landesbetrieb Mobilität (LBM) Cochem-Koblenz commissioned a pilot project as part of its plan to optimise the cold in-place recycling process (CIR). The aim was to examine the extent to which the layer thickness can be reduced
  • New tests for modified bitumens and mixes with RAP
    December 19, 2014
    This month we learn about a new test which is helping to predict the performance of asphalt mixtures containing recycled materials and modifiers, and we showcase some of the new testing equipment recently launched - writes Kristina Smith Researchers in the US have come up with a new test to help owners and contractors better predict the performance of their roads. “The problem is that the current tests cannot determine the performance of new materials,” said Dr Haleh Azari, manager of the AASHTO Advanced P
  • Use 3D modelling to advance sustainable highway construction best practices
    April 30, 2025
    When it comes to advancing highway sustainability, the role of 3D modeling and digital technologies in road construction is becoming ever-more important. Anna Liza Montenegro, director of marketing at Microsol Resources explains why your business needs to get involved now.
  • TRA 2014 showcases the best of cutting-edge transport research and thinking
    July 1, 2014
    Despite tight finances due to the current global economic climate, the recent Transport Research Arena (TRA) 2014 show in Paris showed how innovative transport research, largely using cutting-edge ITS, is creating safer and smarter highways of the future. Guy Woodford reports How far can you drive around a car race track with no other vehicles on it on half a glass of fuel while attempting to maintain a speed of 60kph? After taking up the challenge offered by the Eco Driving Simulator using SiVIC (Simulatio