Skip to main content

Indonesia’s toll road plans

Indonesia’s toll road development plans are being set out.
By MJ Woof October 20, 2020 Read time: 1 min
Indonesia’s new toll road programme - image courtesy © Sansak Khajeefa, Dreamstime.com
Indonesia is developing its network of toll roads across the nation. The programme includes two categories of toll roads, for feeder links and major traffic corridors. Indonesia’s toll roads programme calls for the development of 2,700km of routes in the 2020-2024 time period.

The Indonesian Government will prioritise its funding for the major traffic corridors, also known as backbone toll roads.

These so-called backbone routes include the Trans-Sumatra toll road, the Trans-Java toll road, the Trans-Kalimantan toll road, the Trans-Sulawesi toll road, the Trans-Nusa Tenggara toll road and the Trans-Papua toll road. However, the feeder toll roads are intended to connect with the backbone routes as well as existing and planned commercial and industrial areas.

Related Content

  • Two new bridge links planned for Indonesia
    July 15, 2019
    Discussions are in hand for two major bridge projects in Indonesia. The larger of the two bridges would be a 13.5km structure to connect Bangka Belitung Province with Sumatra Province. The new Selam Bangka Bridge would improve transport between Sumatra, Belitung Island and Bangka Island, boosting the tourist trade as well as agriculture and fisheries. Meanwhile a new 6.4km bridge is planned that will connect Bintan Island with Batam Island. This project is expected to cost around US$198 million, although
  • Plans in hand for new Indonesian tolled highway projects
    May 20, 2015
    Plans are moving forward in Indonesia for the development of a major new tolled highway project. Jakarta Tollroad Development is at present working on purchasing the land required for a key section of the toll road. The new route will run from Sunter in North Jakarta to Semanan in West Jakarta. The plans call for the project to be completed before the Asian Games in 2018. The first phase of the project is for the 20.23km Semanan-Sunter section and the 9.44km long Sunter-Pulogebang stretch. The second phase
  • Cameroon road development plan
    July 23, 2024
    Cameroon plans to develop its road network.
  • Key African highway concession signed
    April 19, 2022
    The concession package has been signed for a key African highway.