Skip to main content

Indonesia’s new toll road development

A construction partnership is looking to build a new toll road connecting Cikunir with Ulujami in Indonesia. The route will be 36.5km long and will help to reduce the chronic congestion around the capital, Jakarta. Building the route is expected to cost US$1.57 billion. The firms involved in the project include both state-owned and privately held companies.
July 31, 2018 Read time: 1 min

A construction partnership is looking to build a new toll road connecting Cikunir with Ulujami in Indonesia. The route will be 36.5km long and will help to reduce the chronic congestion around the capital, Jakarta. Building the route is expected to cost US$1.57 billion. The firms involved in the project include both state-owned and privately held companies.

Related Content

  • Texas toll road opening in 2018
    December 15, 2017
    Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.
  • US$905 million loan for Philippines road
    January 29, 2025
    A US$905 million loan for a Philippines road project
  • Indonesian road firm PT Hutama Karya bullish
    February 14, 2020
    The state-owned Indonesian road firm, PT Hutama Karya, is bullish with strong results.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill