Skip to main content

Indonesian toll road firm to expand network

State-owned Indonesian toll road firm Jasa Marga plans to increase its network by 460km by 2018. This will bring its total network to 1,050km by 2018. During 2016, Jasa Marga intends to spend US1 billion developing its toll road network and general operations. By 2018, the Trans Java toll road should be open to traffic.
December 14, 2015 Read time: 1 min
State-owned Indonesian toll road firm 1083 Jasa Marga plans to increase its network by 460km by 2018. This will bring its total network to 1,050km by 2018. During 2016, Jasa Marga intends to spend US1 billion developing its toll road network and general operations. By 2018, the Trans Java toll road should be open to traffic.

For more information on companies in this article

Related Content

  • Indonesian road firm PT Hutama Karya bullish
    February 14, 2020
    The state-owned Indonesian road firm, PT Hutama Karya, is bullish with strong results.
  • Key toll road projects underway in Indonesia
    September 30, 2014
    Work is progressing on the second phase of a new tolled highway in Indonesia, with a consortium carrying out the construction of the connection between Kualanamu and Tebing Tinggi. The consortium comprises three state-owned construction firms, Pembangunan Perumahan (PP); Hutama Karya; Waskita Karya and toll road operator, Jasa Marga. Construction of the second phase of the project, the connection between Kualanamu Airport and Tebing Tinggi, is underway. In all the construction of the first and second phases
  • Indonesia’s toll road plans
    October 20, 2020
    Indonesia’s toll road development plans are being set out.
  • Jasa Marga picks up a loan for the Medan-Kualanamu project
    April 27, 2015
    In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin