Skip to main content

Indonesian concrete deal for highway work

An Indonesian concrete producer has won a supply deal for major highway work.
By MJ Woof September 16, 2020 Read time: 1 min
An Indonesian concrete specialist will supply materials for a major highway project in the country – image courtesy of © 350jb, Dreamstime.com
Concrete specialist and producer Waskita Beton Precast (Waskita Beton), the concrete producer has won a major contract to supply materials for a key toll road project. Waskita Beton will supply materials forth up to US$264 million for East Java’s Krian-Legundi-Bunder-Manyar toll road project.
 
The firm is supplying ready mix to the project as well as precast girders for use in bridge and overpass construction and precast piles to provide foundation support. The toll road measures 38.3km and is being managed by concessionaire, Waskita Bumi Wira.

Related Content

  • Texas highway contract awarded to Ferrovial
    April 16, 2021
    A key Texas highway contract has been awarded to Ferrovial and its subsidiary.
  • US$528 million loan for Indonesia port
    January 22, 2025
    A US$528 million loan will pay for an Indonesia port upgrade
  • Concrete production advances
    July 23, 2020
    New developments in concrete production will help customers deliver a quality product in timely fashion
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b