Skip to main content

Indonesian concrete deal for highway work

An Indonesian concrete producer has won a supply deal for major highway work.
By MJ Woof September 16, 2020 Read time: 1 min
An Indonesian concrete specialist will supply materials for a major highway project in the country – image courtesy of © 350jb, Dreamstime.com
Concrete specialist and producer Waskita Beton Precast (Waskita Beton), the concrete producer has won a major contract to supply materials for a key toll road project. Waskita Beton will supply materials forth up to US$264 million for East Java’s Krian-Legundi-Bunder-Manyar toll road project.
 
The firm is supplying ready mix to the project as well as precast girders for use in bridge and overpass construction and precast piles to provide foundation support. The toll road measures 38.3km and is being managed by concessionaire, Waskita Bumi Wira.

Related Content

  • Concrete runway surface for Indonesian airport
    May 14, 2020
    The new Yogyakarta International Airport in Indonesia is seeing the benefit of a high-quality runway surface. The runway was built quickly and efficiently to a high standard, using the latest equipment. In all, 11 slipform pavers from Wirtgen played a key role in the airport’s construction.
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Colombia’s longest bridge part of major project
    September 14, 2016
    Construction activity is underway on a number of key transport infrastructure projects in Colombia. A major bridge project spanning the Magdalena River is currently under construction close to the city of Barranquilla in the north of Colombia. The Pumarejo Bridge was commissioned by Instituto Nacional de Vías (INVIAS) and is being built by a consortium. Featuring a cable-stayed design, the bridge will be 2.28km in length, with three lanes for vehicles, as well as a pedestrian area and a cycle track in b
  • Serbia-Kosovo highway work starting
    October 12, 2021
    Work is finally starting on the Serbia-Kosovo highway project.