Skip to main content

Indonesian bridge disaster

A bridge collapse at the weekend on Borneo Island in Indonesia’s East Kalimantan has injured 39 people and killed 11, while at least 30 are missing and presumed drowned. The entire deck of the 720m long suspension bridge collapsed, plunging a bus as well as trucks, cars and motorcycles into the Mahakam River. The bridge was completed in 2002 but suffered serious damage to one of its supports last year when it was struck by a coal carrying barge and has been hit on several previous occasions by vessels plyin
May 15, 2012 Read time: 1 min
A bridge collapse at the weekend on Borneo Island in Indonesia’s East Kalimantan has injured 39 people and killed 11, while at least 30 are missing and presumed drowned. The entire deck of the 720m long suspension bridge collapsed, plunging a bus as well as trucks, cars and motorcycles into the Mahakam River. The bridge was completed in 2002 but suffered serious damage to one of its supports last year when it was struck by a coal carrying barge and has been hit on several previous occasions by vessels plying the river. Reports suggest that one of the support cables for the bridge broke as it was being repaired, triggering the collapse and an investigation into the tragedy has now been ordered by Indonesia’s president.

Related Content

  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • Urgent repairs to Forth Rd bridge
    March 19, 2012
    Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds. The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks. On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.
  • Severn Bridge to have weight restrictions
    April 15, 2025
    The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.