Skip to main content

Indonesia toll road opening to traffic

Work is on track for the building of a key toll road project in Indonesia’s East Kalimantan. The 99.35km toll road runs between Samarinda and Balikpapan and will cut the travel time between the two from three hours to just one hour. The project is costing US$653.2 million to carry out. Work is almost complete for the stretches from Muara Jawa to Palaran and from Samboja to Muara Jawa sections. The section from Balikpapan to Samboja should be ready by April 2019 and the stretch from Samarinda to Palaran shou
February 26, 2019 Read time: 1 min

Work is on track for the building of a key toll road project in Indonesia’s East Kalimantan. The 99.35km toll road runs between Samarinda and Balikpapan and will cut the travel time between the two from three hours to just one hour. The project is costing US$653.2 million to carry out. Work is almost complete for the stretches from Muara Jawa to Palaran and from Samboja to Muara Jawa sections. The section from Balikpapan to Samboja should be ready by April 2019 and the stretch from Samarinda to Palaran should be ready by July 2019. The 11.1km section from Balikpapan to Seinggan Airport should be ready by August 2019.

Related Content

  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.
  • Indonesia toll road completed on schedule
    May 16, 2016
    The construction of the Cipali Toll Road in Indonesia has been completed on time, despite numerous challenges during its construction. The Cipali Toll Road forms part of a larger network, the Trans-Java Toll Road that connects key freeways in Jakarta and beyond. The Trans-Java Toll Road is of enormous importance to Indonesia as it runs for 653km and reduces the existing route by 40km.
  • Indonesia toll road completed on schedule
    May 16, 2016
    The construction of the Cipali Toll Road in Indonesia has been completed on time, despite numerous challenges during its construction. The Cipali Toll Road forms part of a larger network, the Trans-Java Toll Road that connects key freeways in Jakarta and beyond. The Trans-Java Toll Road is of enormous importance to Indonesia as it runs for 653km and reduces the existing route by 40km.
  • Trans-Asia highway connection
    December 11, 2017
    Recent discussions held in Indonesia’s North Kalimantan province with local officials and counterparts from Brunei, Malaysia and the Philippines have focussed on improving transport connections. The four nations have been agreeing a strategy to develop connectivity for the East ASEAN Growth Area (BIMP-EAGA) that they comprise. A target budget of some US$21.4 billion has been set for developing transport infrastructure, including roads and bridges, ports, airports and rail links. The four nations have agreed