Skip to main content

Indonesia claims massive bridge project viable

Construction of a 30km bridge spanning Indonesia’s Sunda Strait would be viable according to Graha Banten Lampung Sejahtera, the consortium tasked with the project. Indonesia’s Public Works Ministry previously said the project was not feasible. Building the 30km Sunda Strait Bridge could cost US$23 billion. The structure would be designed to carry three lanes of traffic in either direction, twin rail tracks and utilities cabling for telecommunications and electricity. Although the high cost of the bridge it
May 27, 2014 Read time: 1 min
Construction of a 30km bridge spanning Indonesia’s Sunda Strait would be viable according to Graha Banten Lampung Sejahtera, the consortium tasked with the project. Indonesia’s Public Works Ministry previously said the project was not feasible. Building the 30km Sunda Strait Bridge could cost US$23 billion. The structure would be designed to carry three lanes of traffic in either direction, twin rail tracks and utilities cabling for telecommunications and electricity. Although the high cost of the bridge itself may never be covered if it relies solely on toll-fee collections, the project's return on investment (ROI) could be generated via other projects that will follow the bridge development, according to Graha Banten Lampung Sejahtera. The company is also planning to set up industrial estates, property projects, and resorts in the areas near the bridge.

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards
  • Dragados among six in the running for fourth Panama bridge deal
    August 23, 2016
    All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi