Skip to main content

Indonesia cancels Sunda Strait Bridge connecting Java and Sumatra

Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project. The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity. But the Jakarta Post newspaper reported that recently elected President Joko Widodo had
November 11, 2014 Read time: 3 mins
Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra.

Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project.

The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity.

But the Jakarta Post newspaper reported that recently elected President Joko Widodo had dumped the megaproject, saying it would benefit only middle class Indonesians. Instead, other options, including buying more ferry ships and upgrading shipping freight ports, will be explored to better connect the two islands.

“Pak Jokowi (Widodo) has personally assessed the Sunda Strait Bridge project and he is concerned that it is not in line with his maritime-based development vision,” said Andrinof Chaniago, National Development Planning Minister.

Chaniago said less expensive solutions than the bridge had been brushed aside by the past federal government which had actively campaigned in this year’s election on the economic benefits of the Sunda Strait Bridge.

The proposed bridge would have been the biggest infrastructure project in the Master Plan for the Acceleration and Expansion of Indonesian Economic Development formulated by former president Susilo Bambang Yudhoyono. Even so, it was left in limbo due to divided opinion among his ministers, especially on how the project should be funded by public and private investors.

But Chaniago left the door open for a bridge in the future. “I am convinced that constructing the Sunda Strait Bridge is not an option for us, at least not in the next 10 to 15 years,” he said.

Earlier this year, 3260 World Highways reported that the consortium Graha Banten Lampung Sejahtera, which was charged with completing a feasibility study, had reaffirmed its belief in the bridge. But the high cost of the project may never be covered solely from toll-fees. It may require other projects that will follow the bridge development, such as industrial estates, property projects and resorts in areas close to bridge access.

Graha Banten president Agung Prabowo said in 2012 that the lack of government support meant it was taking much longer to get permits to conduct a feasibility study. Even if support was there, such a megaproject would need at least three years for a study, the Jakarta Post reported at the time.

“We have been given two years, but we are confident in being able to complete the feasibility study within two years, as long as all elements involved in the project are working together with a strong commitment,” said Prabowo.

For more information on companies in this article

Related Content

  • Transurban to test Melbourne drivers in road trials, including tolls
    June 23, 2015
    Melbourne’s road users are the focus of a year-long study into what options are possible for funding road infrastructure projects including various user-pays models. The study headed by Australian toll roads operator Transurban will conducted across Melbourne’s entire road network to see how drivers react to tolling and other road-use models such as charging motorists for each kilometre travelled, a charge to access roads, annual fixed costs per kilometre on expected usage and price per trip. It will al
  • Pakistan moves on Havelian-Thakot section of China-Pak Corridor
    June 18, 2015
    Pakistan’s infrastructure and economic development agency the Central Development Working Party approved six projects worth US$865 million, including the China-Pak Economic Corridor (CPEC) Raikot section Phase-1. The Raikot section is the 120km Havalian-Thakot stretch and alone is worth around $830 million, according to a report from The Nation newspaper. The agency’s approval is for land acquisition, affected properties compensation and relocation of utilities to give the road a throughway. A report
  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • IBTTA - infrastructure investment
    February 17, 2012
    The International Bridge, Tunnel and Turnpike Association (IBTTA) is giving its backing to strong investment in US infrastructure.