Skip to main content

Indonesia cancels Sunda Strait Bridge connecting Java and Sumatra

Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project. The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity. But the Jakarta Post newspaper reported that recently elected President Joko Widodo had
November 11, 2014 Read time: 3 mins
Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra.

Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project.

The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity.

But the Jakarta Post newspaper reported that recently elected President Joko Widodo had dumped the megaproject, saying it would benefit only middle class Indonesians. Instead, other options, including buying more ferry ships and upgrading shipping freight ports, will be explored to better connect the two islands.

“Pak Jokowi (Widodo) has personally assessed the Sunda Strait Bridge project and he is concerned that it is not in line with his maritime-based development vision,” said Andrinof Chaniago, National Development Planning Minister.

Chaniago said less expensive solutions than the bridge had been brushed aside by the past federal government which had actively campaigned in this year’s election on the economic benefits of the Sunda Strait Bridge.

The proposed bridge would have been the biggest infrastructure project in the Master Plan for the Acceleration and Expansion of Indonesian Economic Development formulated by former president Susilo Bambang Yudhoyono. Even so, it was left in limbo due to divided opinion among his ministers, especially on how the project should be funded by public and private investors.

But Chaniago left the door open for a bridge in the future. “I am convinced that constructing the Sunda Strait Bridge is not an option for us, at least not in the next 10 to 15 years,” he said.

Earlier this year, 3260 World Highways reported that the consortium Graha Banten Lampung Sejahtera, which was charged with completing a feasibility study, had reaffirmed its belief in the bridge. But the high cost of the project may never be covered solely from toll-fees. It may require other projects that will follow the bridge development, such as industrial estates, property projects and resorts in areas close to bridge access.

Graha Banten president Agung Prabowo said in 2012 that the lack of government support meant it was taking much longer to get permits to conduct a feasibility study. Even if support was there, such a megaproject would need at least three years for a study, the Jakarta Post reported at the time.

“We have been given two years, but we are confident in being able to complete the feasibility study within two years, as long as all elements involved in the project are working together with a strong commitment,” said Prabowo.

For more information on companies in this article

Related Content

  • Trimble technology could slice a third off the new highway costs in Indonesia’s US$400 billion infrastructure plan
    February 21, 2014
    Cutting-edge Sandvik Construction equipment is said to be giving ambitious Argentinian quarry firm Canteras Amadeo a commercial advantage .Starting life as a one-quarry enterprise in Córdoba, Argentina, in 1999, Canteras Amadeo is a flourishing business with additional operations in Cordoba and Santiago del Estero. Key to its success is said to be its owners’ embrace of technological improvement, and their choice of Sandvik equipment to improve their processes.
  • Indonesia’s Trans-Papua road gets priority to support National Games
    May 14, 2015
    Indonesia’s president Joko Widodo has vowed to complete the Trans-Papua Highway by 2019, two years later than previously scheduled. Work on the seven-year old project has been dogged by difficulties, including transporting construction equipment and material around the mountainous province on the island of New Guinea, the Jakarta Post newspaper reported The Ministry of Public Works and Public Housing said it will spend around $4.36 billion this year on infrastructure nationally. This will include reha
  • Indonesia’s US$7.01bn for road building to boost connectivity
    August 23, 2013
    From its 2014 budget, the Indonesian government has allocated US$7.01 billion (IDR 74.90 trillion) to the Ministry of Public Works and $3.6 billion (IDR 39.2 trillion) to the Ministry of Transportation to develop national connectivity through road construction. The move, announced by President Susilo Bambang Yudhoyono, will see road transport capacity increased by 3,854.3km in Papua; East Nusa Tenggara; West Nusa Tenggara; Sulawsi; Kalimantan; Bali; Java; and Sumatera. The government will also maintain 3
  • New tolled highway plans for Indonesia
    November 1, 2012
    The authorities in Indonesia have set out extensive plans to source funding for new tolled highways. In all seven highway projects have been identified as crucial to expanding the network and improving connectivity for the Indonesian islands of Sulawesi, Java and Sumatra. Some US$25 billion in loans from overseas has been sourced by the Public Works Ministry of Indonesia.