Skip to main content

Indonesia bridge project plans revived

In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to co
August 9, 2017 Read time: 2 mins
In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to construct now. A feasibility study is being carried out at present, which will give a clearer indication of the likely costs as well as the key technical challenges.


The project forms part of a wider plan by the 1065 Indonesian Government to boost economic development in the islands, which lie to the south of Singapore and across the Singapore Strait. The new link would help develop trade and tourism on Bintan with an improved connection through to the Banda Udara International Airport in Batam. A number of contractors have already expressed interest in the project, although the tendering process has still to be carried out.

For more information on companies in this article

Related Content

  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Honduras bridge development project
    November 10, 2021
    Funding is being supplied for a Honduras bridge development project.
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel
  • Karlsruhe’s Rhine bridge planning to restart
    July 15, 2021
    The proposed road bridge would connect Karlsruhe and Wörth and be built around 1.4km from another Rhine bridge.