Skip to main content

Indonesia bridge project plans revived

In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to co
August 9, 2017 Read time: 2 mins
In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to construct now. A feasibility study is being carried out at present, which will give a clearer indication of the likely costs as well as the key technical challenges.


The project forms part of a wider plan by the 1065 Indonesian Government to boost economic development in the islands, which lie to the south of Singapore and across the Singapore Strait. The new link would help develop trade and tourism on Bintan with an improved connection through to the Banda Udara International Airport in Batam. A number of contractors have already expressed interest in the project, although the tendering process has still to be carried out.

For more information on companies in this article

Related Content

  • Two new bridge links planned for Indonesia
    July 15, 2019
    Discussions are in hand for two major bridge projects in Indonesia. The larger of the two bridges would be a 13.5km structure to connect Bangka Belitung Province with Sumatra Province. The new Selam Bangka Bridge would improve transport between Sumatra, Belitung Island and Bangka Island, boosting the tourist trade as well as agriculture and fisheries. Meanwhile a new 6.4km bridge is planned that will connect Bintan Island with Batam Island. This project is expected to cost around US$198 million, although
  • Indonesia cancels Sunda Strait Bridge connecting Java and Sumatra
    November 11, 2014
    Indonesia pulls back from Sunda Strait Bridge connecting Java and Sumatra Indonesia appears to have shelved construction of a 30km bridge that would have connected the islands of Sumatra and Java – a US$23 billion project. The structure -- a dream of Indonesia's political elite since the 1960s -- was to have three lanes of traffic in each direction, twin rail tracks and cabling for telecommunications and electricity. But the Jakarta Post newspaper reported that recently elected President Joko Widodo had
  • Trimble technology could slice a third off the new highway costs in Indonesia’s US$400 billion infrastructure plan
    February 21, 2014
    Cutting-edge Sandvik Construction equipment is said to be giving ambitious Argentinian quarry firm Canteras Amadeo a commercial advantage .Starting life as a one-quarry enterprise in Córdoba, Argentina, in 1999, Canteras Amadeo is a flourishing business with additional operations in Cordoba and Santiago del Estero. Key to its success is said to be its owners’ embrace of technological improvement, and their choice of Sandvik equipment to improve their processes.
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T