Skip to main content

India’s US$2.2 billion Mumbai Trans Harbour Link opens

India’s US$2.2 billion Mumbai Trans Harbour Link is being opened to traffic.
By MJ Woof January 12, 2024 Read time: 1 min
Mumbai’s chronic traffic congestion will be lessened with the opening of the new Mumbai Trans Harbour Link – image courtesy of © Jaibajpai |Dreamstime.com

The opening of the US$2.2 billion Mumbai Trans Harbour Link in India will help address the city’s chronic congestion problems. This new sea bridge connects Mumbai with the mainland and the route has been inaugurated by India's prime minister, Narendra Modi.

The project has been managed by the Mumbai Metropolitan Region Development Authority. The new route will provide a major boost for the Mumbai Metropolitan Region.

The 29km link has four lanes in either direction and has been designed to carry 130,000 vehicles/day. Measuring just over 29km, the route links South Mumbai with the city’s western suburbs, reducing journey times for drivers to just 40 minutes, compared with two hours previously. It also connects with the new Navi Mumbai airport and Mumbai-Pune Expressway. The toll rates, speed limits and permitted vehicle types have also been announced for the bridge. One of the most complex components of the projects was for the 7.8km-long bridge section across the Mumbai Bay.

Related Content

  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
  • Contracts awarded for India’s sea crossing
    July 2, 2019
    Further progress is being made with the project to build the 17.2km sea crossing in Mumbai. India.
  • What happens when you run out of land for roads?
    November 1, 2021
    Mumbai, the financial capital of India has a population of 12.4 million located in a small area of 437sq.km, surrounded by the sea with nowhere to expand. An increase in congestion on Mumbai’s roads has put a strain on the city’s infrastructure. The result has been long commute times with idling cars contributing to an alarming rise in poor air quality, impacting the quality of life for residents
  • Mumbai’s coastal road project is underway
    April 7, 2021
    Construction work is underway for Mumbai’s complex coastal road project.