Skip to main content

India’s highways could be used as runways

The Indian Air Force (IAF) is suggesting that new highways could also be designed as backup runways for its air defence fleet. The first highway to be constructed so that it could also be used as a runway is likely to be the 302km Lucknow-Agra Expressway. This route will be operational by the end of 2016. The IAF has been working on plans to build emergency runways and has been developing solutions for mobile logistics support. It has also been researching suitable road sections and the minimum infrastr
May 18, 2016 Read time: 2 mins
The Indian Air Force (IAF) is suggesting that new highways could also be designed as backup runways for its air defence fleet. The first highway to be constructed so that it could also be used as a runway is likely to be the 302km Lucknow-Agra Expressway. This route will be operational by the end of 2016.

The IAF has been working on plans to build emergency runways and has been developing solutions for mobile logistics support. It has also been researching suitable road sections and the minimum infrastructure requirements needed. The plans have been shared with India’s Ministry of Road Transport and Highways. The runways would serve as alternative runways for operations if key IAF air force bases were to be attacked.

The idea of using a highway as a temporary runway is by no means new. The first stretches of Germany’s Autobahn system were constructed in the 1930s and these were considered from the outset as being suited to use as temporary runways. During the latter part of WWII, a number of Autobahn sections were used as temporary runways, particularly for fighter operations. Other countries too have used sections of highway at times for military aircraft.

Related Content

  • Indian expressway opens
    August 9, 2012
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas
  • Crushing and screening for producing and re-using
    July 23, 2012
    The recycling and minerals extraction markets now share technologies, Mike Woof reports Not surprisingly, the Steinexpo quarrying event in Germany was a key launch venue for new crushing and screening technologies, as well as associated quarrying technology. Crushing and screening equipment firms from a wide range of European countries including Austria, the Czech Republic, Germany, Ireland, Italy, Sweden, Switzerland and the UK were present at the exhibition. However it was noticeable how closely the miner
  • Western Sydney Airport Bulk Earthworks
    November 7, 2023
    The massive Bulk Earthworks project, under development by the federal government-owned Western Sydney Airport (WSA), entails construction of an international airport on the western side of Sydney, Australia.
  • Safe road barrier innovations
    March 8, 2012
    New road barrier concepts offer major gains in highway safety.