Skip to main content

Indiana bridge being designed by Parsons

Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance
January 3, 2018 Read time: 2 mins
3220 Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance to the Port of Indiana-Burns Harbor, one of the busiest ports in the Midwest. It is also the state’s only deep-water port that receives ships carrying cargo to and from international destinations across Lake Michigan.

Parsons’ services will include bridge, roadway, and maintenance of traffic design as well as National Environmental Policy Act studies and documentation, a topographic survey, geotechnical investigations, right of way acquisition, public outreach, and utility coordination. The new 10 span structure will be 314m long.

For more information on companies in this article

Related Content

  • PB designing infrastructure for connected vehicle project
    April 24, 2012
    Parsons Brinckerhoff (PB) has been selected to design and supervise deployment of technology infrastructure for a US Department of Transportation (US DoT) pilot programme to study the potential of operating connected vehicles on the streets and highways of Ann Arbor, Michigan. Called the Connected Vehicle Safety Pilot Model Deployment project, the $15 million research effort is being undertaken by the University of Michigan Transportation Research Institute (UMTRI) and its partners on behalf of the US DoT.
  • Norwegians would build new bridge and tunnel links
    June 18, 2021
    Norway’s road transport network is changing radically as the country gears up for greater EV use as well as a gradual phasing out of its traditional ferry links
  • Kekava Bybass opens with Kapsch technology
    December 5, 2023
    Latvia’s recently opened “high-speed” Kekava Bypass is using Kapsch traffic technology to ensure safety of drivers as they travel between the capital Riga and Lithuania.
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext