Skip to main content

Indiana bridge being designed by Parsons

Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance
January 3, 2018 Read time: 2 mins
3220 Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance to the Port of Indiana-Burns Harbor, one of the busiest ports in the Midwest. It is also the state’s only deep-water port that receives ships carrying cargo to and from international destinations across Lake Michigan.

Parsons’ services will include bridge, roadway, and maintenance of traffic design as well as National Environmental Policy Act studies and documentation, a topographic survey, geotechnical investigations, right of way acquisition, public outreach, and utility coordination. The new 10 span structure will be 314m long.

For more information on companies in this article

Related Content

  • BC awards last Kicking Horse contract
    November 20, 2020
    Phase Four includes 4km of new highway in Canada’s mostly westerly province.
  • Smart constructioon with GIS, GPS design technology
    May 2, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • 50 Years of road engineering and scientific research
    February 8, 2012
    This year one of IRF's most prominent and active members in the Southern Hemisphere celebrates its 50th Anniversary. Dave Jones looks back over ARRB's first half century of achievement
  • Panama highway rebuilt with concrete
    January 5, 2017
    A highway link to the north of Panama´s capital city that connects with a national park popular with tourists, has now been rebuilt Cement producer and concrete specialist CEMEX carried out a study into the project, to find a cost effective solution. And working with CEMEX, Panama’s Ministry of Public Works began planning for the project in 2015. A 5.7km stretch of the highway has now been improved, with the road structure being built from concrete.