Skip to main content

Indiana bridge being designed by Parsons

Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance
January 3, 2018 Read time: 2 mins
3220 Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance to the Port of Indiana-Burns Harbor, one of the busiest ports in the Midwest. It is also the state’s only deep-water port that receives ships carrying cargo to and from international destinations across Lake Michigan.

Parsons’ services will include bridge, roadway, and maintenance of traffic design as well as National Environmental Policy Act studies and documentation, a topographic survey, geotechnical investigations, right of way acquisition, public outreach, and utility coordination. The new 10 span structure will be 314m long.

For more information on companies in this article

Related Content

  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • New German bridge - cost increase
    September 5, 2022
    An important new German bridge is seeing a cost increase.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove