Skip to main content

Indian highway deals awarded

Two important highway projects have been awarded in Rajasthan State.
By MJ Woof February 21, 2020 Read time: 1 min
India’s Rajasthan State will benefit from further new road construction projects - image © courtesy of Pat Smith

Work on two important road projects in India’s Rajasthan State will commence in due course. The projects were awarded by the National Highways Authority of India (NHAI) to local contractor HG Infra Engineering (HGIEL). In total, the two projects are worth US$284 million.

Both projects are for sections of the NH-148N route, which will connect India’s capital, Delhi, with Vadodora in Gujarat State. One of the projects is for a 33km section between Baonli and Jhalai, which is worth $122 million and is expected to take two years to complete. The other project is worth $162 million and is for a 45.6km stretch of the NH-148N route running from Mui, with the construction work also expected to take two years to carry out.

The two sections of highway will be constructed with four lanes in either direction. The contracts will be carried out under the engineering, procurement and construction (EPC) format.

Related Content

  • TBM for Gotthard Tunnel drive
    August 9, 2024
    A new TBM will be used to drive the new Gotthard Tunnel tube.
  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • Construction work is underway on a new highway in Bolivia
    July 19, 2012
    In La Paz, Bolivia, work is underway to create a new four-lane highway between Oruro to the capital La Paz. The 210km stretch of road, high up in the Andes, is of great political importance with President Evo Morales determined to see completion before the next elections in 18 months’ time.