Skip to main content

India highway link opens to traffic

A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline.
March 6, 2018 Read time: 1 min

A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline. The deal allowed the concession holder to collect tolls on the route for 20 years and nine months once the route opened to traffic. But as construction work on the route fell far behind schedule, this concession arrangement was cancelled in the second quarter of 2015 and the contract was then taken over by another firm. With the change in the construction deal the section of highway was also redesigned and has been built with three lanes in either direction instead of two lanes in either direction as originally conceived.

Related Content

  • Key Florida highway link wins major award
    July 2, 2014
    A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the
  • New section planned for the Pennsylvania Turnpike
    March 27, 2020
    A new stretch of road is needed for the Pennsylvania Turnpike.
  • STRABAG’s German highway assets increased
    October 4, 2018
    STRABAG has increased its stake in the A8 motorway operator PANSUEVIA. This share has been boosted from 50% to 100%. PANSUEVIA operates the autobahn stretch that runs between Ulm and Augsburg in the south of the country. SRABAG purchased the 50% stake in PANSUEVIA that was previously held by HOCHTIEF. As a result, STRABAG is now the 100% owner of the concession company operating the Ulm–Augsburg section of the A8 autobahn. Both parties agreed not to disclose the purchase price however. This section of the
  • Delays on Slovakian projects
    July 9, 2012
    Work on several new highways being built in Slovakia as public-private partnerships (PPPs) will be delayed by six to 12 months. This means that the first sections of the Martin-Presov link will not open before 2011. The last section is expected to be completed in either late 2012 or early 2013.