Skip to main content

Inauguration of Mexico's Baluarte Bridge

Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world. Officials from the Guinness Book of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Brid
March 22, 2012 Read time: 2 mins
Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country.

This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.

Officials from the 4204 Guinness Book Of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Bridge in France.

The structure has presented major challenges during its construction due to the extremely difficult terrain.

Builders had to bore a tunnel at one end to access the site.

The bridge forms part of a new highway connecting Mazatlan on the country’s Pacific Coast with Durango, which will replace the existing twisting, narrow and highly dangerous route.

The new highway will feature nine bridges over 300m high including the Baluarte crossing as well as over 60 tunnels.

Once the new highway is open it will cut journey times between Mazatlan and Durango by six hours, as well as reducing the accident rate.

The highway will form part of a planned new link connecting Mexico’s Pacific and Atlantic coasts.

The official opening of the Baluarte Bridge forms part of Mexico’s celebrations to mark 200 years of independence from Spain.

Finishing work on the Baluarte Bridge has still to be completed, and the crossing will open to traffic later this year.

For more information on companies in this article

Related Content

  • Romania’s Bacău Orbital now complete
    July 19, 2021
    The almost US$161.3 million orbital - of which half is motorway - includes seven bridges, a junction and nine passages.
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel
  • Cleveland Bridge: monuments of culture, bridges that define
    July 2, 2021
    Bridges – many designed and renovated by Cleveland Bridge – are part of a city’s architectural landscape. They help define an urban area’s identity, as Carlos Arias*, the company’s international manager, explains in this special feature.
  • Crane lifts in bridge structure in Germany
    December 14, 2015
    A Terex crawler crane has been used to lift out a concrete bridge in the German town of Zweibrücken. The work was carried out shortly after the Terex Superlift 3800 lattice boom crawler crane had been supplied to Trier-based specialist Steil. The crane hire firm already had four Terex crawler cranes in its fleet with this new arrival bringing the number to five. The machine had a particularly short journey to make to the job site as it had just been manufacturerd at the Terex facility located in Zweibrü