Skip to main content

Inauguration of Mexico's Baluarte Bridge

Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world. Officials from the Guinness Book of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Brid
March 22, 2012 Read time: 2 mins
Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country.

This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.

Officials from the 4204 Guinness Book Of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Bridge in France.

The structure has presented major challenges during its construction due to the extremely difficult terrain.

Builders had to bore a tunnel at one end to access the site.

The bridge forms part of a new highway connecting Mazatlan on the country’s Pacific Coast with Durango, which will replace the existing twisting, narrow and highly dangerous route.

The new highway will feature nine bridges over 300m high including the Baluarte crossing as well as over 60 tunnels.

Once the new highway is open it will cut journey times between Mazatlan and Durango by six hours, as well as reducing the accident rate.

The highway will form part of a planned new link connecting Mexico’s Pacific and Atlantic coasts.

The official opening of the Baluarte Bridge forms part of Mexico’s celebrations to mark 200 years of independence from Spain.

Finishing work on the Baluarte Bridge has still to be completed, and the crossing will open to traffic later this year.

For more information on companies in this article

Related Content

  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Final beam for Gerald Desmond Bridge replacement
    May 1, 2020
    The US$1.47 billion project was started in 2013 and open later this year.