Skip to main content

Inauguration of Mexico's Baluarte Bridge

Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world. Officials from the Guinness Book of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Brid
March 22, 2012 Read time: 2 mins
Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country.

This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.

Officials from the 4204 Guinness Book Of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Bridge in France.

The structure has presented major challenges during its construction due to the extremely difficult terrain.

Builders had to bore a tunnel at one end to access the site.

The bridge forms part of a new highway connecting Mazatlan on the country’s Pacific Coast with Durango, which will replace the existing twisting, narrow and highly dangerous route.

The new highway will feature nine bridges over 300m high including the Baluarte crossing as well as over 60 tunnels.

Once the new highway is open it will cut journey times between Mazatlan and Durango by six hours, as well as reducing the accident rate.

The highway will form part of a planned new link connecting Mexico’s Pacific and Atlantic coasts.

The official opening of the Baluarte Bridge forms part of Mexico’s celebrations to mark 200 years of independence from Spain.

Finishing work on the Baluarte Bridge has still to be completed, and the crossing will open to traffic later this year.

For more information on companies in this article

Related Content

  • Cross Fraser Partnership wins BC tunnel work
    September 27, 2024
    The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Cranes help construct major bridge project in China
    September 8, 2014
    A number of tower cranes have helped complete the Chishi Grand Bridge project in China. Six Potain tower cranes were used to build two 280m tall bridge pylons, high in the clouds above the mountains of southern China. The cranes spent 30 months building the pylons at the Chishi Grand Bridge, which will span 1.47km and carry its road deck 180m above the ground. The bridge will open at the end of 2014.
  • New Wear Crossing cables fully installed and tensioned to 50%
    September 21, 2017
    Structural engineering company VSL International has installed all 28 cable stays of England’s New Wear Crossing and stressed them to 50% of their design load. The next stage of stressing the cables will happen next month and be to 100% of design load. This will allow the construction team to adjust and tension them just enough to lift the bridge deck off the blue steel temporary supports that were constructed in the river to take the weight of the structure.