Skip to main content

Improved expressway connecting Shanghai with Xi’an

Improvement work is due to start on the expressway connecting Shanghai with the city of Xi’an during this year. Work will commence on the 66km section of the Jiangdu-Guangling stretch of the Hushan Expressway. This section runs from the Zhengyi Hub and ends at the Taixing Guangling Hub. The work will see the 19km Jiangdu section of the expressway widened to eight lanes, with four in either direction. This stretch of the project will feature a design speed of 120km/h and will cost US$841 million. The cost fo
January 9, 2014 Read time: 1 min
Improvement work is due to start on the expressway connecting Shanghai with the city of Xi’an during this year. Work will commence on the 66km section of the Jiangdu-Guangling stretch of the Hushan Expressway. This section runs from the Zhengyi Hub and ends at the Taixing Guangling Hub. The work will see the 19km Jiangdu section of the expressway widened to eight lanes, with four in either direction. This stretch of the project will feature a design speed of 120km/h and will cost US$841 million. The cost for the entire Jiangdu-Guangling Section has not been revealed at this stage but the link will be open to traffic by 2017.

Related Content

  • Loaders assist in Chinese concrete production facility
    September 8, 2014
    A fleet of wheeled loaders is playing an important role at a site producing concrete in China. Located at Lintong in Shaanxi Province, in China, the site is producing concrete using gravel from river plains. Lintong lies 35km to the east of Xi’An in western China, the site of the famous Terracotta Army. This new army of SDLG wheeled loaders meanwhile is being used to load gravel from the nearby river plains for Jinsheng Concrete, which sits on the 800km Wei River.
  • Approval given for expressway in China’s Anhui Province
    March 10, 2014
    Official approval has been given to the feasibility report for the Chuzhou-Huainan Expressway project in China’s Anhui province. Construction of the US$1.35 billion expressway will be carried out during 2014 and the projects is due for be completion within 3 years. The 125km route will feature four lanes in either direction and will have a speed limit of 120km/h. The expressway project includes seven interchanges.
  • Vietnam’s North-South Expressway sections
    March 24, 2025
    Key sections of Vietnam’s North-South Expressway are nearly complete.
  • Two new Vietnam expressways
    February 15, 2017
    Work on two new expressways will commence in Vietnam during 2017. The projects are both being managed by the Vietnamese Government and are being constructed in the southern province of Dong Nai. A build-operate-transfer (BOT) format will be employed for the construction of a 60-kilometer-long first section A 60km expressway will run through Tan Phu and Dau Giay and join with the Dau Giay-Lien Khuong expressway, with the work being carried out under the build, operate, transfer model. This expressway