Skip to main content

Iceland has opened its longest tunnel, the Norðfjarðargöng tunnel on Route 92

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms. Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015. The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars
November 14, 2017 Read time: 2 mins
Iceland’s longest tunnel, the Norðfjarðargöng tunnel at nearly 8km long: Nordic drill and blast work before opening (photo Metrostav)

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms.

Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015.

The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars had to pull over at designated stretches to allow oncoming vehicles to pass.

The contractor is a consortium of the Czech-based Metrostav Group and local company Suðurverk. The client is the Icelandic government agency Vegagerðin, the Road and Coastal Administration.

Metrostav has worked in the area before, completing the Siglufjörður and Ólafsfjörður tunnels with a total length of nearly 11km.

Related Content

  • New highway to connect Uzbekistan capital
    October 30, 2013
    In Uzbekistan work is commencing on a key link of the highway connecting capital Tashkent to Osh. The 58km section of the A373 being improved runs though the Kamchik mountain pass and needs to be upgraded due to wear and tear from the winter weather conditions as well as being widened to handle growing traffic levels. The work will be completed by mid-2014 and is costing some US$211 million. The existing road features a single lane running in either direction. The work involves widening the highway so that
  • New Doha highway under construction
    March 18, 2016
    Construction is now underway on the New Orbital Highway in Doha, Qatar. This project is called The New Orbital Highway contract 2 and is one of the largest projects being delivered through the Qatar’s public work authority Ashghal. The work consists of the design and construction of 47km of highway with a five-lane dual carriageway for light vehicles and two truck lanes in each direction. It also includes six viaducts, 17 bridges and underpasses and a 320m cut-and-cover tunnel. This last is particularly
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Carlisle Northern Development Route opens
    April 24, 2012
    A new multi-million pound road which stops motorists having to travel through the centre of Carlisle in North West England has opened to the public two months ahead of schedule. The new Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor.