Skip to main content

Iceland has opened its longest tunnel, the Norðfjarðargöng tunnel on Route 92

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms. Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015. The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars
November 14, 2017 Read time: 2 mins
Iceland’s longest tunnel, the Norðfjarðargöng tunnel at nearly 8km long: Nordic drill and blast work before opening (photo Metrostav)

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms.

Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015.

The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars had to pull over at designated stretches to allow oncoming vehicles to pass.

The contractor is a consortium of the Czech-based Metrostav Group and local company Suðurverk. The client is the Icelandic government agency Vegagerðin, the Road and Coastal Administration.

Metrostav has worked in the area before, completing the Siglufjörður and Ólafsfjörður tunnels with a total length of nearly 11km.

Related Content

  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian hi
  • A decade for completing the 105km Cork-Limerick M20
    December 10, 2018
    It could be a decade before Ireland’s 105km Cork-Limerick M20 motorway is finished, the government has warned. Road safety groups and businesses have been pushing for the €900m M20 motorway because of issues over fatalities on the existing rural route. Simon Coveney, Ireland’s deputy prime minister, said the government was committed to the route – the largest motorway project to be undertaken in the next 25 years, and money has been earmarked for it. According to Irish media, Coveney also noted tha
  • Estonia surveys major roads with a RetroTek-M retroreflectometer
    May 22, 2019
    During the past two years, Estonia’s Road Administration has clocked up 4,021km during a retroreflectivity project on all main state roads and on basic roads. Estonia’s Road Traffic Development Department of the Estonian Road Administration has been working with ERC Consulting to gather retroreflectivity data on road markings on all main state roads and basic roads. The work has shown that out of 1,609km of main state roads, 20% had problems. The reflective effect is created by glass beads on the surf