Skip to main content

Iceland has opened its longest tunnel, the Norðfjarðargöng tunnel on Route 92

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms. Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015. The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars
November 14, 2017 Read time: 2 mins
Iceland’s longest tunnel, the Norðfjarðargöng tunnel at nearly 8km long: Nordic drill and blast work before opening (photo Metrostav)

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms.

Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015.

The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars had to pull over at designated stretches to allow oncoming vehicles to pass.

The contractor is a consortium of the Czech-based Metrostav Group and local company Suðurverk. The client is the Icelandic government agency Vegagerðin, the Road and Coastal Administration.

Metrostav has worked in the area before, completing the Siglufjörður and Ólafsfjörður tunnels with a total length of nearly 11km.

Related Content

  • VIDEO: Sarens raises the pylon for New Wear Crossing in Sunderland
    February 13, 2017
    It was as weekend working in Sunderland city, northeast England, for global lifting specialist 8569 Sarens.

    Over the two days, the Belgian company gently raised a 1,550tonne steel pylon that will form the backbone of the New Wear Crossing – no official name yet – across the River Wear.

    General work on the two-span cable-stay bridge started on the bridge in May 2015. The structure will be supported by the single double pylon and will have four vehicle lanes, as well as dedicated cycle and pedestrian routes.
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.