Skip to main content

Iceland has opened its longest tunnel, the Norðfjarðargöng tunnel on Route 92

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms. Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015. The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars
November 14, 2017 Read time: 2 mins
Iceland’s longest tunnel, the Norðfjarðargöng tunnel at nearly 8km long: Nordic drill and blast work before opening (photo Metrostav)

Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms.

Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015.

The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars had to pull over at designated stretches to allow oncoming vehicles to pass.

The contractor is a consortium of the Czech-based Metrostav Group and local company Suðurverk. The client is the Icelandic government agency Vegagerðin, the Road and Coastal Administration.

Metrostav has worked in the area before, completing the Siglufjörður and Ólafsfjörður tunnels with a total length of nearly 11km.

Related Content

  • Canada: doubts persist about proposed Howse Pass highway through Rocky Mountains
    March 11, 2020
    Alberta group attempts to revive the idea of a Howse Pass highway.
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
  • Special concrete paver for UK road job
    January 5, 2015
    A specially adapted Wirtgen SP25i concrete slipformer has been used on the M6 motorway near Cannock in the UK. The machine worked together with a Wirtgen ISF25i (independent side feeder) in order to pave a concrete slab under difficult conditions. With an overall length of 373km, the M6 is the longest and one of the most heavily congested motorways in the UK. The M6 connects the M1 motorway near Rugby with Carlisle near the Scottish border. But due to the steadily growing volume of traffic, the Highways
  • GPS machine control paves the way for Turkish canal
    February 7, 2012
    GPS machine control for earthworks and concrete paving is helping to fast track construction of an irrigation canal in Turkey - Claire Symes reports. The Turkish economy is expected to flourish as a result of construction of a new irrigation channel currently underway in the east of the country. This canal is benefiting from the latest concrete paving and earthmoving technology and will bring with it prosperity to a deprived area of the country. But the project is already taking the lead in terms of Turkish