Skip to main content

Hungary’s national road development boom gathers pace

Hungary is experiencing a road development boom. In line with the country's New Szechenyi Plan (USZT), some €3.67 billion (HUF 1.1 trillion) is to be made available for road development works. National infrastructure development company NIF says it launched road projects worth a total of €1.5 billion (HUF 450 billion) in 2013. Contracts have been signed for the full amount. Hungary's M4 motorway is to be opened in 2016 between Abony and Fegyvernek. The 29km motorway section will also include a bridge over
January 7, 2014 Read time: 2 mins
Hungary is experiencing a road development boom.

In line with the country's New Szechenyi plan (USZT), some €3.67 billion (HUF 1.1 trillion) is to be made available for road development works. National infrastructure development company NIF says it launched road projects worth a total of €1.5 billion (HUF 450 billion) in 2013. Contracts have been signed for the full amount.

Hungary's M4 motorway is to be opened in 2016 between Abony and Fegyvernek. The 29km motorway section will also include a bridge over the river Tisza. NIF will also add two new lanes to the M85 and M86 roads. Additionally, the country's Number 8 road will also be turned into a dual carriageway on a 42km stretch between Szekesfehervar and Herend. Other projects include road surface strengthening and the construction of several bypass road sections. Most projects are due to be completed inside the next two years. Companies taking part in the projects are 184 Colas, 945 Strabag, 3454 Kozgep, Duna Aszfalt and Euro-Aszfalt among others.

Meanwhile, in line with a government decree, a new section of Hungary's M0 orbital is to be built between the number 10 and 11 highways. The section will have a total length of 8km, of which some 50% is expected to run through an underground tunnel. Investment costs are estimated at around €335.82 million (HUF 100 billion). Construction works will not start before 2017.

For more information on companies in this article

Related Content

  • Delays on Slovakian projects
    July 9, 2012
    Work on several new highways being built in Slovakia as public-private partnerships (PPPs) will be delayed by six to 12 months. This means that the first sections of the Martin-Presov link will not open before 2011. The last section is expected to be completed in either late 2012 or early 2013.
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Texas highway contract awarded to Ferrovial
    April 16, 2021
    A key Texas highway contract has been awarded to Ferrovial and its subsidiary.