Skip to main content

Hungary’s national road development boom gathers pace

Hungary is experiencing a road development boom. In line with the country's New Szechenyi Plan (USZT), some €3.67 billion (HUF 1.1 trillion) is to be made available for road development works. National infrastructure development company NIF says it launched road projects worth a total of €1.5 billion (HUF 450 billion) in 2013. Contracts have been signed for the full amount. Hungary's M4 motorway is to be opened in 2016 between Abony and Fegyvernek. The 29km motorway section will also include a bridge over
January 7, 2014 Read time: 2 mins
Hungary is experiencing a road development boom.

In line with the country's New Szechenyi plan (USZT), some €3.67 billion (HUF 1.1 trillion) is to be made available for road development works. National infrastructure development company NIF says it launched road projects worth a total of €1.5 billion (HUF 450 billion) in 2013. Contracts have been signed for the full amount.

Hungary's M4 motorway is to be opened in 2016 between Abony and Fegyvernek. The 29km motorway section will also include a bridge over the river Tisza. NIF will also add two new lanes to the M85 and M86 roads. Additionally, the country's Number 8 road will also be turned into a dual carriageway on a 42km stretch between Szekesfehervar and Herend. Other projects include road surface strengthening and the construction of several bypass road sections. Most projects are due to be completed inside the next two years. Companies taking part in the projects are 184 Colas, 945 Strabag, 3454 Kozgep, Duna Aszfalt and Euro-Aszfalt among others.

Meanwhile, in line with a government decree, a new section of Hungary's M0 orbital is to be built between the number 10 and 11 highways. The section will have a total length of 8km, of which some 50% is expected to run through an underground tunnel. Investment costs are estimated at around €335.82 million (HUF 100 billion). Construction works will not start before 2017.

For more information on companies in this article

Related Content

  • Hungary may introduce Budapest congestion charge
    January 16, 2015
    Hungary is considering introducing a congestion charge scheme to capital Budapest at the end of 2016. The aim of the scheme is to cut congestion in the city, with traffic jams and delays frequent particularly in the historic centre. The scheme will also help generate revenue that will pay back EU funding worth some €565.2 million, which was used to pay for the construction of the M4 underground line in the city.
  • Planning Netherland's underground highways
    May 15, 2012
    The first agreements for Amsterdam’s proposed underground highway have now been reached. These have been made by the Dutch Minister for the Environment and Transport as well as Amsterdam local authority and the province of North-Holland. Under the agreed terms, the A10 highway will feature 12 lanes of traffic in four 1.2km tunnels under the capital, Amsterdam. The project will also include building metro and rail lines underground.
  • UK’s A14 route to open early
    February 11, 2020
    Highways England has announced that the UK’s A14 route is to open early.
  • Colas-built bridge opens over River Ipoly
    August 9, 2023
    Colas divisions in Hungary and Slovakia cooperated on constructing a recently opened bridge between Ipolydamasd in Hungary and Helemba in Slovakia.