Skip to main content

Hungary motorway project awarded

Work is now starting on a new stretch of motorway in Hungary. The project was awarded to the Colas Hungaria-Colas Ut consortium and is worth some €54.74 million. The work involves building a new section of the M35 motorway connecting road number 481 with road number 4 and the contract was awarded by the Hungarian national infrastructure development firm, NIF. Local contractor STR Epito will build a new road connecting road number 47 with the M35, with work starting in July 2016 and due for completion in
June 7, 2016 Read time: 2 mins
Work is now starting on a new stretch of motorway in Hungary. The project was awarded to the Colas Hungaria-Colas Ut consortium and is worth some €54.74 million. The work involves building a new section of the M35 motorway connecting road number 481 with road number 4 and the contract was awarded by the Hungarian national infrastructure development firm, NIF.

Local contractor STR Epito will build a new road connecting road number 47 with the M35, with work starting in July 2016 and due for completion in early 2018. STR Epito’s contract is worth €15.9 million.

Local contractors Duna Aszfalt and Hodut meanwhile will build a 20.2km road connecting the road number 481 with the M35 motorway in a deal worth €149.6 million. This project is also starting in July 2016 and due for completion in early 2018.

However Hungary is facing a fine from the European Commission due to restrictions imposed for a number of road project tenders.

Related Content

  • Ukraine’s shattered highways
    July 26, 2024
    With no end to its war with Russia in sight, Ukraine is also fighting hard to cope with a growing backlog of major infrastructure projects, especially in terms of rebuilding the country’s roads and bridges. David Arminas reports.
  • Budimex consortium win Poland’s Ostroda ringroad court case
    March 18, 2015
    A district court in the Polish town of Olsztyn has ruled in favour of a consortium of Budimex and Ferrovial Agroman which challenged the awarding of a ringroad contract to a rival. The ruling means that the Salini consortium’s winning bid for the construction of a ringroad around Ostroda is overturned on the basis that it was ineffectually low. This means that the contract will go to the Budimex consortium which proposed to build the road for around €223 million. Polish builder Budimex is the consortium's m
  • French highway package
    March 1, 2012
    A new PPP deal has been signed in France for the financing, design, construction, service and maintenance on a 15-year land-use bypass road southwest of Vichy.
  • Uganda expressway connection; construction due to start
    September 25, 2019
    Construction work is due to start on the expressway project connecting Busega with Mpigi in Uganda. The contract was awarded to the Chinese construction firms China Civil Engineering Construction Corporation (CCECC) and China Railway 19th Bureau Group Company Limited. The companies have established a joint venture partnership to handle the work. The project is costing around US$147 million and the 24km expressway should take around three years to build. A loan from the African Development Bank is helping to