Skip to main content

Hungarian dual carriageway project underway

Work is underway on the M76 dual carriageway project in Hungary, with the first section due for completion in summer 2020. Building the 40km dual carriageway is costing over €523 million. The project includes building a bridge at Balatonszentgyorgy, which is due for completion shortly. When it opens to traffic, the M76 will connect the M7 motorway (the E71 route) with the M74 route at Zalaegerszeg.
June 12, 2019 Read time: 1 min

Work is underway on the M76 dual carriageway project in Hungary, with the first section due for completion in summer 2020. Building the 40km dual carriageway is costing over €523 million. The project includes building a bridge at Balatonszentgyorgy, which is due for completion shortly. When it opens to traffic, the M76 will connect the M7 motorway (the E71 route) with the M74 route at Zalaegerszeg.

Related Content

  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • Bosnia tunnel project; work starting
    November 1, 2019
    Construction work is due to start on the Prenj Tunnel project in Bosnia. The tunnel will form part of the important Corridor 5C route. Measuring 10km in length, the road and tunnel project is expected to cost €820 million to build. Funding is being supplied jointly by the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD). The Bosnian Government has also secured a portion of the necessary funding from Bosnian banks. In addition, a contract has been agreed for the
  • Work underway on Texas highway upgrades
    August 25, 2020
    Work is well underway on key Texas highway upgrade projects.
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.