Skip to main content

Houston bridge project, construction paused

Work is being paused on the construction of the new Ship Channel Bridge replacement project close to Houston, Texas.
By MJ Woof January 20, 2020 Read time: 1 min
Construction of the pylons for Houston’s Ship Channel Bridge is being paused for redesign work to be carried out, though other portions of the link are still being built: Image © courtesy of Harris County Toll Road Authority

The Harris County Toll Road Authority (HCTRA) is pausing work to build the main pylons for the cable-stayed portion of the new Sam Houston Tollway Ship Channel Bridge. This will give time to review the design of the section of bridge being constructed at present. The consulting and engineering firm COWI identified an issue related to the design of the curved portions of the pylon legs. Pausing the construction will provide time for the engineer of record (FIGG) to design a solution. This will then be reviewed by COWI. When COWI and FIGG agree on the design changes, construction work for the pylons will be able to resume.

However, work will continue for other sections of the project, such as the approaches.

Related Content

  • Odebrecht plans to use US contract to boost world turnover
    April 24, 2012
    Brazilian Construction company Odebrecht says it aims to use revenues generated from its new US road construction contract and further potential Stateside work to boost its global turnover. The company’s new US$45.8million contract involves the renovation of the Sam Houston Tollway between Route 59 and Route 288 in the southern area of Harris County, Texas. The US market currently accounts for 1% of Odebrecht's turnover in the construction sector but the firm is also keen to win other Texas contracts, a
  • Innovative Ohio River Bridge crossing
    March 31, 2016
    Work is underway on an innovative new bridge link over the Ohio River in the US.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Chilean bridge project achieves resolution
    February 26, 2020
    A resolution has been achieved for Chile’s Chiloe Island bridge project.