Skip to main content

Houston bridge project, construction paused

Work is being paused on the construction of the new Ship Channel Bridge replacement project close to Houston, Texas.
By MJ Woof January 20, 2020 Read time: 1 min
Construction of the pylons for Houston’s Ship Channel Bridge is being paused for redesign work to be carried out, though other portions of the link are still being built: Image © courtesy of Harris County Toll Road Authority

The Harris County Toll Road Authority (HCTRA) is pausing work to build the main pylons for the cable-stayed portion of the new Sam Houston Tollway Ship Channel Bridge. This will give time to review the design of the section of bridge being constructed at present. The consulting and engineering firm COWI identified an issue related to the design of the curved portions of the pylon legs. Pausing the construction will provide time for the engineer of record (FIGG) to design a solution. This will then be reviewed by COWI. When COWI and FIGG agree on the design changes, construction work for the pylons will be able to resume.

However, work will continue for other sections of the project, such as the approaches.

Related Content

  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Mersey Gateway Project reaches half-way point across the Mersey
    March 10, 2017
    The Mersey Gateway project in England has passed a significant milestone, with over half of the main bridge deck stretching across the River Mersey. Work to install stay cables on the main bridge also passed a key point, with installation of the 31st 150m long cable – the halfway point for stay cable installations on the pylon. When complete, 146 stay cables will support the 1km-long reinforced concrete bridge, with a combined load-bearing weight of more than 53,000tonnes. “We’re now more than 50