Skip to main content

Houston bridge project, construction paused

Work is being paused on the construction of the new Ship Channel Bridge replacement project close to Houston, Texas.
By MJ Woof January 20, 2020 Read time: 1 min
Construction of the pylons for Houston’s Ship Channel Bridge is being paused for redesign work to be carried out, though other portions of the link are still being built: Image © courtesy of Harris County Toll Road Authority

The Harris County Toll Road Authority (HCTRA) is pausing work to build the main pylons for the cable-stayed portion of the new Sam Houston Tollway Ship Channel Bridge. This will give time to review the design of the section of bridge being constructed at present. The consulting and engineering firm COWI identified an issue related to the design of the curved portions of the pylon legs. Pausing the construction will provide time for the engineer of record (FIGG) to design a solution. This will then be reviewed by COWI. When COWI and FIGG agree on the design changes, construction work for the pylons will be able to resume.

However, work will continue for other sections of the project, such as the approaches.

Related Content

  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.
  • Turkey’s 1915 Çanakkale Bridge opens
    April 11, 2022
    The bridge beats Japan’s Akashi Kaikyo Bridge to be the world’s longest suspension bridge.
  • First bridge deck section joined on UK’s Mersey Gateway project
    June 30, 2017
    The Mersey Gateway bridge project near Liverpool in England passed a milestone recently with the first joining of two of the deck sections.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on